Building Automation and Management Systems include the central control, monitoring and reporting of the electro-mechanical systems such as heating, cooling, ventilation systems, generators, air pressure tanks, VRV-VRF systems, fan coils, VAV's, lighting, parking control systems, CO exhaust gas monitoring and controlling depending on the type of facility. In addition, the Building Automation and Management System is generally integrated with other security systems such as CCTV (Close Circuit TV), access control, fire detection systems provides control of the building from a single center with minimal staff and maximum efficiency.
The main target is saving in operating costs and ensuring full control by using the most effective way for resource management and reporting depending on the sector of enterprises, comfort-control requirements, electro-mechanical systems and also by minimizing the human factor in mechanical system controls such as heating, cooling, ventilation, water supply etc..
The main target is to maximize the lighting energy efficiency of the indoor, outdoor and architectural lighting systems, by controlling the systems with time, occupancy, ambient and outdoor light parameters and pre-defined scenarios. Central monitoring, controlling, reporting and energy saving are the main focuses.
Parking Security and Automation Systems:
These systems cover the monitoring exhaust gas concentration in parking lots; the activation of the audio-visual warning units and the operation of the exhaust fans if the pre-set threshold level is exceeded.
Through the integration between the Building Automation and Management System(BMS) and all the other electronic systems in a building such as fire detection, access control, CCTV, employee time attendance etc., maximum efficiency and control increase exponentially across the enterprise and also the communication and coordination between different systems can be done from a single center.
All automation platforms cannot provide the integration and compatible operation between the Building Automation System and the other different systems or packaging equipment that exist or will be added later depending on the needs of the potential expansions. Establishing a Building Automation System that supports the open platform infrastructures such as BACnet, Modbus, LON, M-Bus provides the possibility to minimize the brand dependence for the customer.
The key factors which are necessary to establish a system are to continue the vitality of the system without being dependent on the companies or persons, to supply correct products, documentation and spare parts, to provide backward compatibility, global product and technical service support.
By establishing partnerships with the world's leading manufacturers, we can supply the proper systems for you, keep your system up to date, and provide after-sales support within the systems lifetime.
The determining factors of the Building Automation System design are the electromechanical infrastructure of the building, the intended use of the building, the number of technical and business personnel and their education and experience level, the possibility of expansions, savings and the needs of system management. The industrial facilities, residential buildings, hotels, shopping centers, office buildings, hospitals, and educational institutions have both common and different requirements for the automation and integration.
When you request a Building Automation System project from EEC, the following steps are applied to implement the most appropriate system for you:
The existing electro-mechanical system is examined and then the automation scope will be determined by taking into consideration your requests.
The necessity and the level of integration between the Building Automation System and the other systems (such as CCTV, fire alarm, card access, elevators, industrial automation, etc.) is determined.
The automation scenarios are discussed and created according to the design of your project company.
The system is presented with options including material and installation costs by taking into needs of future expansions.
When the final system design is completed, at first the implementation projects are prepared; then the engineering, programming, graphic design, installation and programming works are completed and after your technical personnel are trained in the field, finally the system is delivered.
The initial stage of the operation of the system is supervised by our engineers to complete the insufficiency of the system operators and perform small programming settings if it is necessary.
After the complete system handover, our technical service team is ready for your maintenance and service needs.
In addition to local and network-connected hardware and software, to provide complete turn-key solutions, we have heating-cooling-ventilation field equipment, security equipment such as gas-water-CO leakage detection units and other control equipment in our range products.